Methodology

How the numbers are made

No black box. This page walks through every rule the calculator applies, with the example from the homepage computed live so you can check it against the yard.

The short version

You give the dimensions and the product. The engine looks up that product in the manufacturer catalog, applies a waste rate for the pattern and the shape, sizes the base for the use and the soil, and turns everything into the units the yard sells: pallets and layers, tons, bags, linear feet. Every surface you see afterwards, the results page, the report, the PDF, the supplier copy and the emails, prints the same stored result. Nothing is recomputed between them.

1. Area and perimeter

Rectangles, L shapes, circles and half circles are measured exactly. If you enter square footage directly, the outline is estimated and the list says so, because edging and base overhang depend on it. Up to five sections can be added together. Where a section touches the house, that length is taken out of the exposed edge: no edge restraint, no base overhang, no border there.

2. Waste

Waste is the extra you order for cuts and breakage. It is built from four parts: a pattern rate (running bond needs less than herringbone or a random ashlar), a piece-size adjustment from the catalog, 5% more when the shape has curves, and 2 to 5% more when a section is narrow, because narrow runs are mostly cuts. The total is capped at 25%. The exact breakdown is printed next to the paver line.

3. Pavers, pallets and layers

Coverage per pallet and per layer comes from the catalog for the exact product and thickness. The order is stated as whole pallets plus loose layers, because most Connecticut yards sell layers. Where the catalog does not publish layers for a product, the list falls back to full pallets and says so. The full-pallet count is always printed too, in case your yard sells full pallets only.

4. Base and bedding

Base depth follows the use and the soil you pick. These are the depths Connecticut masons build to, not the bag instructions.

UseFirm soilAverage soilSoft or wet soilBase past the edge
Patio5 in6 in8 in6 in
Walkway5 in6 in7 in6 in
Pool deck5 in6 in8 in6 in (outer edge only)
Driveway8 in8 in12 in12 in

The base footprint is the paved area plus the overhang along every exposed edge. Gravel is figured on that footprint at the compacted depth, times 1.2 for the loose volume the truck carries, at 1.6 tons per loose cubic yard of 3/4 in processed gravel. Bedding sand is 1 in of concrete sand over the base footprint at 1.35 tons per cubic yard. Never stone dust under pavers in Connecticut.

5. Edging, fabric and joint sand

Edge restraint runs the exposed outline, with one 10 in spike per foot. Geotextile fabric covers the base footprint plus 5% for laps. Polymeric sand is sized from the manufacturer's coverage table for the joint width and paver size, in 50 lb bags. Permeable pavers get open-graded joint stone instead of polymeric sand.

6. Excavation and spoil

Dig depth is base plus sand plus the paver thickness, minus a 1 in reveal above grade, plus a half inch buffer. Spoil volume is the base footprint times the dig depth. Spoil weight uses 1.2 tons per cubic yard of bank soil. Haul options are shown by truck class so you can plan the dumpster or the trips. Spoil is the installer's job; it is never part of a yard delivery.

7. Delivery

Pallets go on a flatbed, typically 6 to 8 per trip. Each bulk material rides its own truck: gravel and sand do not share a load. Over about 10 tons a tri-axle dump makes one trip; under that, a small dump truck makes more.

8. Pool decks

The pool comes first. The walkway band is the pool perimeter times the walkway width plus the corners (squared corners for rectangles, a rounded corner term for ovals). Bigger areas for chairs or a table are added by side, length and how far out they go, capped to the side plus the walkway on both ends. The coping band comes out of the paver field, and coping is its own line: pieces equal the perimeter divided by the unit length, plus corner pieces where the product makes them, plus a waste rate that is 12% for straight paver coping cut on site to a curve and zero for ready-made radius coping or fabricator-cut bluestone. Coping is assumed mortar-set on the pool beam, Type S at about one bag per 10 feet plus 10%, labeled an estimate. The water is never counted as pavers.

9. Walls, steps, bluestone and bulk

Retaining and garden walls: block pallets from face area and catalog coverage with 7% waste, caps and corners as the product provides, a gravel footing trench, drainage pipe and stone behind the wall, and geogrid layers once the wall is tall enough to need them. Granite steps: the count from total rise and step thickness, checked against Connecticut's 8.25 in maximum riser and the 24 to 25 in comfort rule. Bluestone: pallets from coverage per pallet by thickness with 10% cut waste, dry-laid on gravel and stone dust or mortar-set on an existing slab. Bulk materials: volume from length, width and depth, 20% extra for materials that compact, converted to tons by the material's density where the yard sells by weight.

A worked example

A 16 by 20 ft patio in Nicolock Holland Stone, running bond, average soil.

ItemQuantityHow it was figured
Nicolock Holland Stone, Granite City Blend2 pallets + 9 layersArea 320 sq ft plus 7.1% waste = 343 sq ft, divided by the catalog coverage per pallet and per layer.
3/4 in processed gravel base12.6 tonsBase footprint 357 sq ft (the slab plus 6 in past every exposed edge) at 6 in compacted, times 1.2 for loose volume, at 1.6 tons per loose cubic yard.
Concrete sand bedding1.5 tonsThe base footprint at 1 in, times 1.35 tons per cubic yard.
Geotextile fabric375 sq ftBase footprint plus 5% for laps.
Plastic edge restraint72 lin ftExposed outline only. An edge along the house gets none.
10 in restraint spikes72 eachOne per foot of restraint.
Polymeric sand, 50 lb bags5 bagsManufacturer coverage per bag for this joint width and paver size.
Dig depth8.9 inBase plus 1 in sand plus the paver, minus a 1 in reveal above grade, plus a 0.5 in buffer.
Soil to remove9.8 cu ydBase footprint times dig depth.
Spoil weight11.8 tonsSpoil volume at 1.2 tons per cubic yard of bank soil.
Computed now by the live engine (v2.2 / 2026-08-17-build2), catalog 2.3. The homepage shows the same job.

What this tool does not do

Where the data comes from

Product coverage, piece sizes, pallet weights and pattern compatibility are taken from the published Nicolock, Cambridge, Belgard and Techo-Bloc catalogs and spec sheets (the catalog version is stamped on every result). Base and compaction practice follows CMHA (formerly ICPI) Tech Spec 2 adjusted for Connecticut frost, as built by the mason behind this tool. Granite step limits follow the Connecticut amendments to the residential code. Polymeric sand coverage follows the manufacturers' technical data sheets. Every engine change is run against a certification suite of fixed test jobs before it goes live; the engine version is stamped on every result too.

Run your own numbers Pallets, tons, bags and the dig, from manufacturer catalog data. We call you before anything is ordered.
Start the calculator