Home › Calculators › Pool deck calculator
Calculator

Pool deck calculator

Most calculators have you guess a big rectangle and subtract the water. This one asks the way a mason asks: how big is the pool, how wide is the walk around it, and where do you want it bigger.

What you need to measure

No tape measure handy? Open Google Maps, find your house in satellite view, right-click the start of the edge and choose Measure distance, then click the other end. Aerial measurements are usually within a foot. Confirm on the ground before ordering.

A worked example

A 40 by 20 ft rectangle pool, 4 ft walkway, one 16 by 8 ft lounge area, bluestone coping, Nicolock Holland Stone.

Plan view drawn from the example dimensions
Plan view drawn from the example numbers. Your results page draws yours.
ItemQuantityNote
Nicolock Holland Stone, Granite City Blend5 pallets + 1 layerCovers 612 sq ft. Or 6 full pallets if the yard sells full pallets only. Confirm layer availability with the dealer. Includes 9.1% cut waste (8% pattern - 0.9% piece size + 2% narrow sections = 9.1%).
Thermal bluestone coping, 12 x 24 in63 piecesPool edge 120 lin ft. 24 in pieces, 12 in wide. Includes 5% for site cuts on the curve. End and corner cuts. Curves are cut by the fabricator to a template; order to the perimeter with no spare. Confirm piece size with the yard.
Type S mortar for coping14 bagsCoping is assumed mortar-set on the bond beam. Estimate at about 1 bag per 10 lin ft of coping.
3/4 in processed gravel base26.9 tons6 in compacted. 16.8 cu yd loose. Base footprint 757 sq ft incl. overhang past the pavers.
Concrete sand bedding3.2 tons1 in screeded bed. Never stone dust under pavers.
Geotextile fabric795 sq ftIncludes 5% lap allowance. Under the gravel base.
Plastic edge restraint168 lin ftExposed edges only.
10 in restraint spikes168 eachOne per foot of edge restraint.
Polymeric sand, 50 lb bags11 bagsSized on Alliance Gator Maxx Sand. 75 sq ft per bag. 0.125 in joints.
Pallet delivery (flatbed)1 trip5 pallets + 1 layer. Pavers delivered on flatbed, typically 6-8 pallets per trip. About 15,810 lbs of pavers.
Base Gravel (3/4 in) delivery2 trips2 tri-axle dump deliveries (about 13.5 tons each). Each bulk material rides its own truck.
Concrete Sand delivery1 trip1 small dump truck trip (3.2 tons). Each bulk material rides its own truck.
Dig depth8.9 in6 in base + 1 in sand + 2.375 in paver minus 1 in reveal + 0.5 in buffer
Soil to remove20.8 cu ydSpoil disposal is the installer's job, not part of the material delivery.
Spoil weight25 tonsAt 20.8 cu yd of spoil, plan a dump truck, roll-off container, or haul contractor, pickup counts below are reference only.
Haul by small dump truck7 loads3.6 tons, 3 cu yd. Weight-limited estimate, assumes about 4-ton usable payload.
Haul by pickup, heavy duty (3/4-ton class)20 loads1.3 tons, 1 cu yd. Weight-limited estimate, assumes about 1.25-ton usable payload.
Haul by pickup, standard (1/2-ton class)34 loads0.7 tons, 0.6 cu yd. Weight-limited estimate, assumes about 0.75-ton usable payload.
Computed now by the live engine (v2.2 / 2026-08-17-build2). Your job will differ; this is what the list looks like.

Questions

Is the pool water counted as paver area?

Never. The deck is built around the water from the walkway width you enter, so the water surface is deducted by construction, not by a number you have to remember to subtract.

How is coping counted?

As its own line: the pool perimeter divided by the piece length, plus corner pieces where the product makes them, plus a waste rate. Straight paver coping cut on site to a curve gets 12%; ready-made radius coping and fabricator-cut bluestone get none and are rounded up with no spare. Coping is assumed mortar-set on the pool beam.

What about curved pools?

Round, oval and freeform pools add 5% to the paver waste for the cuts along the curve, and the outer edge is figured on the curve, not on a box around it.

Does the pool edge get edge restraint?

No. The pool edge is confined by the coping and the beam. Edge restraint and base overhang apply to the outer edge only.

Quantities are planning estimates from manufacturer catalog data. We will call you to confirm quantities and availability before anything is ordered. Nothing is final until you have spoken with us. How the numbers are made.
Run your own numbers About two minutes. We call you before anything is ordered.
Open this calculator