Calculator Paver walkway calculator
Walkways are mostly edges and cuts. This calculator adds the right waste for a narrow run and sizes the base for foot traffic on your soil.
What you need to measure
- Length and width of each run. A walkway under 4 ft wide gets extra waste for cuts.
- Curves: say so, and 5% more is added for the cuts along the curve.
- Which side runs along the house or a wall.
- Soil: firm, average, or soft and wet.
No tape measure handy? Open Google Maps, find your house in satellite view, right-click the start of the edge and choose Measure distance, then click the other end. Aerial measurements are usually within a foot. Confirm on the ground before ordering.
A worked example
A 4 by 30 ft walkway in Nicolock Holland Stone, running bond, average soil.
| Item | Quantity | Note |
|---|---|---|
| Nicolock Holland Stone, Granite City Blend | 1 pallet + 2 layers | Covers 144 sq ft. Or 2 full pallets if the yard sells full pallets only. Confirm layer availability with the dealer. Includes 10.1% cut waste (8% pattern - 0.9% piece size + 3% narrow sections = 10.1%). |
| 3/4 in processed gravel base | 5.4 tons | 6 in compacted. 3.4 cu yd loose. Base footprint 155 sq ft incl. overhang past the pavers. MasonPilot recommended default (6 in) applied. |
| Concrete sand bedding | 0.6 tons | 1 in screeded bed. Never stone dust under pavers. |
| Geotextile fabric | 163 sq ft | Includes 5% lap allowance. Under the gravel base. |
| Plastic edge restraint | 68 lin ft | Exposed edges only. |
| 10 in restraint spikes | 68 each | One per foot of edge restraint. |
| Polymeric sand, 50 lb bags | 2 bags | Sized on Alliance Gator Maxx Sand. 75 sq ft per bag. 0.125 in joints. |
| Pallet delivery (flatbed) | 1 trip | 1 pallet + 2 layers. Pavers delivered on flatbed, typically 6-8 pallets per trip. About 3,720 lbs of pavers. |
| Base Gravel (3/4 in) delivery | 2 trips | 2 small dump truck trips (about 2.7 tons each). Each bulk material rides its own truck. |
| Concrete Sand delivery | 1 trip | 1 small dump truck trip (0.6 tons). Each bulk material rides its own truck. |
| Dig depth | 8.9 in | 6 in base + 1 in sand + 2.375 in paver minus 1 in reveal + 0.5 in buffer |
| Soil to remove | 4.3 cu yd | Spoil disposal is the installer's job, not part of the material delivery. |
| Spoil weight | 5.2 tons | |
| Haul by small dump truck | 2 loads | 2.6 tons, 2.2 cu yd. Weight-limited estimate, assumes about 4-ton usable payload. |
| Haul by pickup, heavy duty (3/4-ton class) | 5 loads | 1 tons, 0.9 cu yd. Weight-limited estimate, assumes about 1.25-ton usable payload. |
| Haul by pickup, standard (1/2-ton class) | 7 loads | 0.7 tons, 0.6 cu yd. Weight-limited estimate, assumes about 0.75-ton usable payload. |
Computed now by the live engine (v2.2 / 2026-08-17-build2). Your job will differ; this is what the list looks like.
Questions
Why is walkway waste higher than patio waste?
A narrow run is mostly edge. Every row ends in a cut on both sides, so a 4 ft walkway carries 3% more waste than a wide patio in the same pattern, and a walk under 3 ft carries 5% more.
Does a walkway need edge restraint?
Yes, on every edge that is not against a structure. It is what keeps the outside rows from creeping. One spike per foot.
How deep is the base for a walkway?
Five inches on firm soil, six on average, seven on soft or wet ground, plus one inch of bedding sand.
Quantities are planning estimates from manufacturer catalog data. We will call you to confirm quantities and availability before anything is ordered. Nothing is final until you have spoken with us. How the numbers are made.